
Replacement of the track ropes of the “Fonte Cerreto – Campo Imperatore” aerial tramway
Ropeway engineering
Following in-depth investigations into the condition of the track ropes, requested by ANSFISA after the five-yearly overhaul and the track ropes shifting on the “Fonte Cerreto – Campo Imperatore” reversible aerial tramway, it became necessary to replace all four of the cable car’s track ropes.
Altevie, as part of the EGGS network of companies, was responsible for the detailed design and works supervision.
The installation operations essentially followed the procedures set out in the design, although they were completed in less time than the original schedule.
Gallery






