Dismantling of chairlifts and construction of a new detachable gondola lift at Frontignano

Ussita, MC 2022 – ongoing

Ropeway engineering

In the Frontignano ski resort, within the Monti Sibillini National Park, Altevie was responsible for the Technical and Economic Feasibility Project, works supervision and health and safety coordination for the dismantling of the OM05 “Fonte di Frontignano – Vallone di Selvapiana”, OM07 “Arboretti – Malghe del Cornaccione” and OM08 “Madonna pian della Croce – Memoria dei Fascinari” chairlifts, and for the construction of a 10-seater detachable gondola lift named “Frontignano – Cornaccione”.

Although relatively simple, the line route was carefully defined to blend into a natural setting of great environmental value.

As well as being accessible to skiers coming from the adjacent slope, the bottom station is connected to the “Saliere” car park by a public lift that links the parking area directly with the platform of the ropeway station.

The top station is integrated into a partially underground building, above which a mountain hut will be built as part of a separate project.

A distinctive feature of the ropeway is the intermediate station located at Arboretti, serving the uphill direction only.

Gallery

The project in pictures

Dismantling of chairlifts and construction of a new detachable gondola lift at Frontignano01 / 06
Dismantling of chairlifts and construction of a new detachable gondola lift at Frontignano, photo 1 of 6

Request a consultation