
Ongoing
Detachable gondola lift “Ponte Bondio – Mottolino”
Ropeway engineering
In the Livigno ski area, Altevie, as part of the EGGS network of companies, was responsible for works supervision for the replacement of the “Ponte Bondio – Mottolino” gondola lift with a new 10-seater detachable gondola lift. The ropeway, built as part of the projects in preparation for the Milano Cortina 2026 Olympics, is designed to operate in both winter and summer and can carry bicycles and all categories of users.
Gallery






